Construction of Nilgrath Baltal road
Construction of Nilgrath Baltal road,Ganderbal(Languishing since:June, 2017)
The Retaining wall is 8.00 km long and is both side of the Nilgrath Baltal road which provides safety from land erosion due to the river nearby when the water level is high. | |